The cycle time for long‑shaft machining has been reduced from 17 minutes to 5 minutes: a long‑shaft machining enterprise in Anhui has adopted the Juxin CNC machining solution.
I. Customer’s Machining Challenge: Long‑shaft machining—why is it so difficult to balance efficiency and stability?
Machining long‑axis components places specific demands on machine tool rigidity, machining stability, and process‑tooling compatibility. In particular, when machining agricultural‑machine parts such as long fork shafts, mismatches between the equipment and the machining process can lead to issues like tool chatter, prolonged cycle times, and suboptimal dimensional consistency.
An Anhui-based universal joint shaft manufacturer previously used conventional lathes to machine long shafts, facing the following key challenges:
- Tool vibration is prone to occur during machining: It affects processing stability and places higher demands on process adjustments and on-site operations.
- Unsatisfactory processing efficiency: The cycle time for single-piece processing is relatively long, making it difficult to meet the enterprise’s production‑efficiency requirements.
- There is pressure on accuracy and consistency: Batch processing requires attention not only to the quality of each individual part but also to consistent performance throughout continuous production.
For mass‑production enterprises, addressing these challenges requires going beyond whether a machine tool can perform a specific operation; it also calls for a comprehensive assessment of the machining strategy, equipment architecture, production takt time, and subsequent automation integration.
II. Sample Verification: The processing cycle time has been reduced from 17 minutes to 5 minutes.
To meet the customer’s requirements for long-axis machining, Juxin Machine Tool conducted sample verification using the JXLC45HA dual‑station, dual‑spindle CNC vertical lathe.
Test results show that the customer’s single‑part machining cycle time has been reduced from the original 17 minutes to 5 minutes.
This change allowed the customer to clearly see the improvements in production efficiency brought by the new machining process. Following validation with test samples, the customer promptly placed an order for two JXLC45HA CNC vertical lathes and plans to integrate them with a robotic arm to achieve automated production.
From 17 minutes to 5 minutes, the key is not merely the numerical reduction; rather, the new process has been validated through trials on actual workpiece samples, demonstrating its practical value in this machining scenario.
It should be noted that this cycle‑time data corresponds to the specific workpiece and machining conditions in this case. Since different long shafts vary in dimensions, material, machining allowances, process sequencing, and accuracy requirements, the actual machining cycle times will also differ.
III. Equipment Configuration: JXZ200-800 end-milling and center-hole drilling machine + JXLC45HA double‑station CNC vertical lathe
The equipment purchased by the customer in July 2026 includes:
- 1 JXZ200-800 end-milling and center-hole drilling machine
- Two JXLC45HA double-station, twin-spindle CNC vertical lathes
Among these, the JXZ200-800 is used for end-face milling and center-hole drilling; the JXLC45HA is employed for subsequent turning operations on long shafts. The specific sequence of machining steps shall be determined in accordance with the customer’s actual process plan.
For long‑axis components, there is a seamless integration between the preliminary machining of end faces and center holes and the subsequent turning operations. Employing dedicated machining equipment tailored to these processes enables enterprises to optimize equipment deployment and production planning in alignment with the workpiece’s manufacturing workflow.
In this case, the customer did not opt for a single piece of equipment; instead, they configured a face-milling and center-drilling machine along with a dual‑station, twin‑spindle CNC vertical lathe to meet their long‑shaft machining requirements, thereby establishing a robust equipment foundation for subsequent production planning and automation integration.
IV. Why Choose a Double-Station, Double-Spindle CNC Vertical Lathe?
The JXLC45HA features a dual‑station, dual‑spindle configuration, with its key characteristic being the integration of two relatively independent machining units into a single machine. Each station is equipped with its own spindle, turret, and CNC system, enabling flexible scheduling of machining operations based on the specific workpiece and process requirements.
Unlike single-spindle, twin-turret configurations, the key feature of a double‑station, double‑spindle vertical lathe lies in the integration of two independent machining units. For workpieces and processes suited to this architecture, machining tasks, equipment layout, and automated loading/unloading can be planned in alignment with actual production requirements.
In long‑shaft machining applications, equipment selection must still be validated in light of the workpiece’s length, diameter, machining allowances, rigidity requirements, and process flow. The machine tool’s design alone does not guarantee that all long shafts will achieve identical cycle times or machining results; actual performance must be assessed based on test‑piece trials.
In this case, Juxin Machine Tool validated the machining process using actual workpiece samples provided by the customer. After confirming the improvement in cycle time, the customer placed an order for two machines and plans to integrate robotic systems to advance automated production.
V. From Equipment Procurement to Automated Production Planning
The customer has placed an order for two JXLC45HA double‑station, dual‑spindle CNC vertical lathes, configured with a robotic arm to support automated production.
The integration of a robotic arm with a machine tool requires a holistic design that takes into account the workpiece loading/unloading method, equipment layout, machining cycle time, and safety requirements. A well‑designed automation solution must not only optimize the machine’s processing speed but also balance loading/unloading times, seamless equipment interfacing, operational stability, and on‑site production management.
For long‑shaft machining enterprises with similar needs, when planning automated production, the following factors should be given particular consideration:
- Is the workpiece suitable for automated loading and unloading by a robotic arm?
- Do the machine tool’s machining cycle time and the loading/unloading cycle time match?
- Is the logistics and workflow coordination among multiple devices smooth?
- Do the workpiece positioning, clamping method, and machining accuracy meet the requirements?
- After the automated equipment is put into operation, can it be aligned with actual production requirements and staffing levels?
Automation is not simply about adding a robot to the side of a machine tool; rather, it requires integrating the machine tool, manufacturing processes, material handling, and production organization into a cohesive, holistic plan.
VI. Equipment Operation Feedback: Accuracy and Consistency Remain Excellent
According to customer feedback, the equipment is currently operating normally, with excellent machining accuracy and consistency, and has experienced no malfunctions during use.
For batch processing, the machining performance during the trial‑run phase serves as a critical basis for equipment selection, while the equipment’s sustained operational performance after commissioning also warrants close attention.
In this case, the customer first validated the machining cycle time using actual workpiece samples, then proceeded to select the equipment and define the automation configuration. This selection approach—grounded in real‑world workpieces and processes—provides a valuable reference for companies with similar long‑shaft machining requirements.
Conclusion
In response to issues of tool chatter, efficiency, and consistent machining accuracy in the production of agricultural machinery long‑fork shafts, a universal joint shaft manufacturer in Anhui conducted validation of the machining process on the Juxin JXLC45HA dual‑station, dual‑spindle CNC vertical lathe using actual workpiece samples.
Test results show that the cycle time per part has been reduced from 17 minutes to 5 minutes. In July 2026, the customer will purchase one JXZ200-800 end-milling and center-drilling machine and two JXLC45HA double‑station, twin‑spindle CNC vertical lathes, with plans to integrate robotic systems to advance automated production.
For manufacturers of long-axis components, when selecting equipment, in addition to evaluating machining accuracy and efficiency, it is essential to conduct a comprehensive assessment that takes into account the workpiece characteristics, process flow, machine tool design, and automation requirements.
Juxin Machine Tools offers specialized CNC machine tools and machining solutions tailored to the processing needs of shaft-type and other rotary components. For specific workpieces, we recommend conducting trial runs to verify equipment suitability and cycle times, thereby determining the most appropriate machine configuration.